London In 55 Minutes From Rye And 68 Minutes From Hastings

By Stuart Harland Chairman MarshLink Action Group At the end of March Network Rail announced the Hastings – London line had re-opened after major works to reinstate a large number of track failures along the line caused by the weather.

Residual Railway Land at Rye

Residual Railway Land at Rye At the recent meeting of the Marshlink Partnership it was revealed that a sections of Railway land on both sides of the line between the Tillingham and the Ferry Road Crossing are being considered for railway or integrated transport uses.